Skip to content

An aquaculture tank fitted to the farm layout.

Custom open tanks can follow your farm's working water depth, cleaning access and piping layout. We manufacture the FRP shell and agree a delivery or assembly arrangement suited to the installation area.

Working depth, water connections and support contacts are coordinated with the site's installation route.

Open rectangular FRP tank during site assembly with an external steel support frame.
We make
Open rectangular tanks
We coordinate
Water connection planning
You receive
Agreed delivery or assembly

Fit the water plan and the available space.

An aquaculture tank needs to fit both the available space and the way the farm handles water. Working depth, inlet and outlet positions, drainage and access for cleaning all affect the shell. The support arrangement also needs to be considered before the tank reaches the site.

Working water depth in the available area

The tank footprint and height must follow the farm plan while retaining maintenance space.

Water-contact surfaces for the intended use

The internal construction needs to reflect water chemistry, species and the stated cleaning conditions.

Pipework and supports at the site

Connections and support contacts must meet the farm’s water system and base arrangement.

The component supported for review of its shape and assembly interfaces in a workshop.

How we customize the parts.

Size and working depth

Length, width and height follow the farm plan and working water level, with room left for maintenance around the open tank.

Water-contact surfaces

Internal construction and finish are chosen for your water chemistry, temperature, species and cleaning agents.

Pipes and support contacts

Inlets, outlets, overflow and drains follow your piping drawing. Base and wall support points are checked against the site support design.

Close inspection of pipes and support contacts on the component.
The component being prepared in a composites workshop before assembly.

Fabricate the shell

The tank is made with the agreed internal finish and reinforced connection areas. Any prepared section joints follow the selected assembly arrangement. Before delivery, the section joints and tank checks are reviewed alongside the site's assembly and filling sequence. This distinguishes factory work from joining and commissioning on the farm.

A tank arrangement the site team can prepare for.

The tank and its water connections share one farm layout. Including support contacts and delivery access in that arrangement helps the installation team prepare the receiving area and pipework around a defined shell.

Open rectangular FRP tank during site assembly with an external steel support frame.

A shell following the water layout

Working depth and connections suit the farm arrangement.

Support contacts coordinated

The base and wall contacts relate to the site support drawing.

Delivery access considered early

The selected assembly method follows the route into the receiving area.

Dimensions and design options

Product family
Custom FRP Aquaculture Tanks
Production basis
Approved drawing or sample
Reference geometry
Large rectangular tank
Interfaces
Drainage and circulation connections by layout
Duty review
Water chemistry, cleaning and support requirements

Aquaculture tank layouts

Rectangular holding tank

Rectangular tank

Straight sides and an open top suit a rectangular holding area.

Long raceway shell

Raceway tank

A long open channel follows an end-to-end water-flow layout.

Round tank layout

Round tank

Round tank walls join a bottom and drain shaped to your circulation design.

Sectioned site assembly

Sectional tank

Separate sections allow delivery through routes too small for a one-piece tank.

Custom tank dimensions and drains

Plan size and drain locationInner width, length and drain position are made to your tank plan.Tank widthTank lengthDrain position

Plan size and drain location

Inner width, length and drain position are made to your tank plan.

Open rectangular aquaculture tank with a broad rim and round low-front and side connection openings

Open rim and pipe connections

Rims and low front or side pipe openings are positioned to match your drain and circulation layout.