Skip to content

Construction Site Booths

This fiberglass cabin provides a sign-in and permit-handover point at a construction-site entrance. An observation window faces approaching visitors, while the staff door and PPE storage can sit away from the queue. The base can be prepared for a raised support frame and planned moves between site locations.

White molded GRP site entrance booth with single front observation pane and narrow side window on a separate concrete pad

Compact observation shell with a defined temporary-pad and staff-path relationship.

Choose your site-entry cabin layout

Single-pane observation face

Single-pane observation face

A compact observation window faces the site approach beside the staff registration desk.

Permit handover counter

Permit handover counter

A closable opening above a projecting shelf gives staff a place to exchange permits and registration forms.

Staff and PPE storage plan

Staff and PPE storage plan

A staff-side door and dedicated PPE-storage area sit behind the visitor registration face.

Raised temporary-base interface

Raised cabin base

A raised support frame fits the temporary pad, with specified handling points for planned site moves.

Site sign-in cabins and temporary bases

Cabin and sign-in face

The shell size, viewing windows and document counter can be arranged around the registration desk.

Staff entry and storage

The side door, threshold and PPE storage fixings are placed away from the sign-in queue.

Relocation and site identification

Raised-base and handling details can accommodate planned site moves. The shell can include service-entry openings and areas for replaceable notices, with an exterior color suited to the site identification scheme.

Observation window and base fit

Viewing pane and temporary padPane width describes the observation opening, and sill height locates its lower edge above the cabin base level. Pad projection shows how far the separate pad extends beyond the raised cabin base.Observation pane widthWindow sill heightPad projection

Viewing pane and temporary pad

Pane width describes the observation opening, and sill height locates its lower edge above the cabin base level. Pad projection shows how far the separate pad extends beyond the raised cabin base.

Construction-site booth with a sliding window, side staff door and lower service panel, raised on supports over a separate pad

Raised cabin and separate pad

The cabin sits raised on supports over a separate pad, with a sliding window, side staff door and lower service panel positioned for your site layout.

All FRP Booths

FRP Construction Site Booth

White molded GRP site entrance booth with single front observation pane and narrow side window on a separate concrete pad

Compact observation shell with a defined temporary-pad and staff-path relationship.