Water & Wastewater Plants
Upgrade water and wastewater plants with FRP tanks, basin internals and extraction ducts made for the existing site. We customize the sections and material construction around the process conditions, installation space and maintenance needs.

Where it is used
A basin upgrade beside a covered inlet channel
A wastewater upgrade can involve both new baffles inside a basin and extraction ducts above a covered channel. The two systems serve different purposes, but they share a tight installation area. Their supports and removable sections must leave the walkway and lifting areas clear.
- Module edges and elevations follow the process engineer's basin and operating-level drawings.
- Supports and removable sections must keep the maintenance walkway clear.
- Duct bends, flanges and gas-collection branches must fit the surveyed channel route.
Our approach
Matched to the process and the plant
Size the baffles for installation and removal
We check the basin schedule against your support drawings and handling limits. Module lengths, attachment areas and top-edge levels follow the process layout, and we confirm there is room to release and lift each removable section.
The module layout preserves the process engineer's specified levels and leaves room for installation and later removal.

Route the duct clear of the service corridor
We lay out the duct from the extraction connections on the covered channel. Elbows, flange directions and section lengths are checked against the supports and walkway, with room to reach the bolts and remove the sections intended for maintenance.
The fabrication schedule locates each bend, connection and removable length against the site survey.

Match the material to the process
We review the liquids and gases in contact with each part, along with temperature, cleaning exposure and any pressure or vacuum. The material specification and inspection plan address those conditions separately for the baffles and ductwork.
Each component has a defined construction and agreed checks for its operating conditions.
What we can supply
Fabrication and site scope
Basin components for their defined duties
Basin partitions, overflow weir plates and launder sections are identified separately in the component schedule. Weir crest profiles and levels follow the process designer's requirements; duct sections follow their own extraction route.
Checked, protected components
The specified inspection records ship with each delivery group, and baffle edges, flange faces and projecting branches are protected for handling.
Engineering and installation scope
Your engineer is responsible for hydraulics, extraction duty, support design and system acceptance. Steelwork, gaskets, bolts, lifting and erection are arranged separately.
Ductwork, tanks and basin components
Tanks, weirs, ducts and pipework
- Duct sections prepared for the surveyed extraction route.
Bends, flange orientations and joint positions follow the equipment connections and site handling limits.
- Basin modules that share one crest and fixing reference.
Curved channels, notched plates and support contacts follow the process layout together.
- Water storage shaped around a restricted space.
The rectangular body combines the available footprint with reinforcing ribs, top access and planned pipe connections.
- Pipe bends that meet the route at both ends.
Bend geometry and flange orientation are considered together, reducing separate adjustments during fit-up.