Skip to content

Water & Wastewater Plants

Upgrade water and wastewater plants with FRP tanks, basin internals and extraction ducts made for the existing site. We customize the sections and material construction around the process conditions, installation space and maintenance needs.

Application concept of segmented FRP baffles in a concrete process basin beside a covered channel with a separately supported extraction header.

Where it is used

A basin upgrade beside a covered inlet channel

A wastewater upgrade can involve both new baffles inside a basin and extraction ducts above a covered channel. The two systems serve different purposes, but they share a tight installation area. Their supports and removable sections must leave the walkway and lifting areas clear.

  • Module edges and elevations follow the process engineer's basin and operating-level drawings.
  • Supports and removable sections must keep the maintenance walkway clear.
  • Duct bends, flanges and gas-collection branches must fit the surveyed channel route.

Our approach

Matched to the process and the plant

  1. Size the baffles for installation and removal

    We check the basin schedule against your support drawings and handling limits. Module lengths, attachment areas and top-edge levels follow the process layout, and we confirm there is room to release and lift each removable section.

    The module layout preserves the process engineer's specified levels and leaves room for installation and later removal.

    Concept of bolted basin baffle sections on separate posts, with one removable module on a padded rack beside a drained maintenance bay.
  2. Route the duct clear of the service corridor

    We lay out the duct from the extraction connections on the covered channel. Elbows, flange directions and section lengths are checked against the supports and walkway, with room to reach the bolts and remove the sections intended for maintenance.

    The fabrication schedule locates each bend, connection and removable length against the site survey.

    Concept of a flanged FRP extraction elbow and removable spool, supported from a fixed concrete wall beside separate removable channel covers.
  3. Match the material to the process

    We review the liquids and gases in contact with each part, along with temperature, cleaning exposure and any pressure or vacuum. The material specification and inspection plan address those conditions separately for the baffles and ductwork.

    Each component has a defined construction and agreed checks for its operating conditions.

What we can supply

Fabrication and site scope

Basin components for their defined duties

Basin partitions, overflow weir plates and launder sections are identified separately in the component schedule. Weir crest profiles and levels follow the process designer's requirements; duct sections follow their own extraction route.

Checked, protected components

The specified inspection records ship with each delivery group, and baffle edges, flange faces and projecting branches are protected for handling.

Engineering and installation scope

Your engineer is responsible for hydraulics, extraction duty, support design and system acceptance. Steelwork, gaskets, bolts, lifting and erection are arranged separately.

Ductwork, tanks and basin components

Tanks, weirs, ducts and pipework